Integrity Roofing and Painting
Homeowner Checklist

What to Expect the Day of Your Roof Install, and How to Prepare

It is loud, it is fast, and it goes smoother when you know the order of things. Here is the day from the night before to the final inspection.

Veteran-owned Family-run since 1990 650+ Google reviews

On roof install day, the crew arrives in the morning, protects your yard and home, tears the old roof off down to the deck, makes any decking repairs, installs the underlayment, flashing and new shingles, and cleans up with a magnetic sweep before leaving. It is loud from start to finish. To prepare: move cars out of the garage and driveway, take pictures off the walls, cover things in the attic, keep pets and small children away from the work, and turn off the sprinklers. The building department’s final inspection comes after the work is done.

The night before: your checklist

  • Cars out. Move vehicles out of the garage and off the driveway; the dumpster or trailer and material drop need the space, and you may not be able to get out once work starts.
  • Sprinklers off. Wet lawns make ladders and walkways slippery.
  • Walls and shelves. Take pictures, mirrors and fragile items off walls and high shelves. Hammering and tear-off shake the house.
  • Attic. Cover stored items with drop cloths or plastic. Dust and grit fall through, especially when old wood shakes come off.
  • Patio and yard. Move furniture, grills, planters and toys away from the house. Cover the hot tub and pool, and turn off the pool sweeper; nails travel farther than you expect.
  • Pets. Keep them inside in a quiet room, or arrange a day away. The noise is hard on animals.
  • Kids. Explain the rules: no going near ladders or the drop zone, and use the door the crew tells you is safe.
  • Work from home? Plan calls elsewhere. Conference calls under a tear-off do not work.

Install day, in order

A roofer greeting the homeowner on the morning of the install

  1. Arrival and walkthrough. The project manager confirms the shingle and color, reviews any upgrades, and walks the property with you. This is the time to point out sprinkler heads, septic lids, buried lines and anything delicate.
  2. Protection. Tarps and plywood go over landscaping, the AC condenser, decks and the area by the garage door.
  3. Tear-off. Old shingles, underlayment, valley metal, drip edge and pipe boots come off and go straight into the container. PPRBD requires removing all existing layers before new asphalt shingles go on.
  4. Decking check. Soft, rotted or delaminated boards are replaced. If spaced plank decking is found, it must be re-decked or overlaid to meet code.
  5. Dry-in. Drip edge, ice and water membrane at the eaves, valleys, walls and penetrations, then underlayment across the field. Crews only open what they can dry in before weather or dark.
  6. Shingles and details. Starter, field shingles, new pipe flashing, step flashing, ventilation and matching hip and ridge cap.
  7. Clean-up. Gutters cleared, yard picked up, and a rolling magnet run over the lawn, driveway and beds.

Every component on that list, and why it is there, is in the Integrity Roofing System.

After the crew leaves

  • Wear shoes outside for a few days. Magnets catch most nails, but a stray one can turn up.
  • Walk the roof line with your project manager and point out anything you want addressed.
  • The final inspection. The permit holder schedules it; you do not need to be home for an exterior roof inspection in most cases.
  • Paperwork. Keep the invoice, the permit card and the manufacturer warranty registration together. If insurance paid for the roof, your insurer may need the final invoice to release recoverable depreciation.
  • Shingles look wavy? If it was cold, read when winter-installed shingles seal.

Questions to ask any roofer before you sign

  • Who will be on site, and who is my one point of contact?
  • Will you pull the permit before materials arrive?
  • What do you do if you find bad decking, and how is it priced?
  • How do you protect landscaping, the AC unit and the garage door?
  • What is your weather plan?

If your house has wood shakes, also read why switching from cedar shake requires roof vents. Wondering about timing? See can you install roofs year-round in Colorado?

Schedule your Colorado Springs roof

Integrity Roofing and Painting is veteran-owned and family-run since 1990, an Owens Corning Platinum Preferred contractor with 650+ Google reviews. Our crews install to manufacturer specifications under superintendent oversight, with photo documentation along the way. Call (719) 488-2800, book a free roof inspection, or read about roof replacement in Colorado Springs. Financing is available if you want to spread out the cost.

Sources: Pikes Peak Regional Building Department, Reroofing Guidelines (rev. 03/05/2024) and Hail and Disaster Information.

Where Install Day Fits in Our Process

1

Schedule Your Free Inspection

Call or book online. We reach out the same business day, confirm a time, and a Client Solutions Representative researches your property so they arrive prepared.

2

Thorough Roof Inspection

Your rep inspects the attic, roof surface, flashing, gutters, and the rest of the exterior, and documents what they find with detailed photos so nothing gets missed.

3

Honest Assessment & Options

We walk through exactly what we found and present Good, Better, and Best options with upfront pricing. If the roof does not need work, we tell you that.

4

Clear Paperwork & Claim Documentation

You get a written contract that spells out the scope. If you are filing an insurance claim, the claim stays yours: we provide photo documentation and make sure nothing gets missed in the scope.

5

Expert Installation

Our crews install to manufacturer specifications under superintendent oversight, with quality checks and photo documentation at every stage.

6

Final Walkthrough & Warranty

We clean the site, walk you through the completed work, register your manufacturer warranty, and stay available for anything down the road.

Frequently Asked Questions

Do I have to stay home while my new roof goes on?

Not for the whole day, but be reachable. Plan to be there when the crew arrives so the project manager can walk the property with you, and keep your phone on in case the crew finds rotted decking or a hidden problem that needs your decision.

What happens if it rains or snows on install day?

Crews tear off only what they can dry in, and carry tarps. Rain in the forecast can be workable; snow, ice or high wind usually means rescheduling. Expect a call before the day if the forecast changes the plan.

Can materials be dropped off before the permit is issued?

Not in PPRBD's area. Its reroof guidelines treat stocking materials on the driveway or roof as the start of the project, so stocking before the permit is issued brings a triple permit fee and a stop work order. A good roofer pulls the permit first.

When does the building inspection happen?

After the work is finished. A typical asphalt reroof in PPRBD's area has no mid-roof inspection, only a final, and the contractor who pulled the permit requests it. After a big hailstorm, inspections can take a while, because PPRBD does not offer same-day or next-day reroof inspections then.

Start With a Free Roof Inspection

Honest findings, photos of what we see, and clear options before you commit to anything. We'll reach out the same business day.

Veteran-owned Family-run since 1990 Owens Corning Platinum 650+ Google reviews No obligation Financing available

Prefer to talk? Call (719) 488-2800

Request Sent!

Thanks. We'll review your request and reach out with the next step. For faster help, call (719) 488-2800.

We'll reach out the same business day. Your info stays with us, never sold or shared.